Today

Espenhof West Retirement Housing

Espenhof West Retirement Housing

Architect

Weyell Zipse Architekten

Construction

Construction

HSSP AG

HSSP AG

Client

Stiftung Alterswohnungen der Stadt Zürich (SAW)

location

Langgrütstrasse 89, 8047 Zürich

Dates

2023 – 2024

2023 – 2024

Starting point

As the final component in the comprehensive renewal of the SAW Espenhof estate, a contemporary, barrier-free retirement housing development was to be built in Zürich-Albisrieden. The replacement building involved demolishing the existing building, including the removal of hazardous materials, and constructing 28 flats for older people with shared areas. It was a public project with formal tendering procedures and high requirements for sustainability (Minergie-P-ECO) and inclusive design.

The hybrid construction, with a concrete core and timber-panel building, and the tight cost and time frame placed high demands on the coordination of design and construction.

Today

What emerged

As project manager for construction management, I was responsible for coordinating all relevant design and construction steps, from demolition and the public tendering to execution on site. Cost control and reporting to the client, scheduling, and the coordination of specialist consultants and contractors were in my hands.

A central element of the project is the “Rue Intérieure”, a shared circulation zone conceived as the estate’s public living room. Built in concrete, it sets itself apart from the timber-frame construction of the flats.

Today
Today
Today

What remains

The result is a contemporary, barrier-free retirement housing development with 28 flats that allows independent living in old age. The project was designed to the Minergie-P-ECO standard and fitted with a photovoltaic system. It places particular weight on inclusive design that takes account of the needs and rights of people with disabilities.

My scope

My scope

SIA phases 31 to 52 (construction management)

Overall project lead for construction management

Coordination of specialist consultants

Preparation and monitoring of the construction programme

Tendering, bidding procedure and contract award (public procedure)

On-site management of the works

Cost control and reporting to the client

Coordination of hazardous-materials removal and excavation

ALL IMAGES

Today
Today
Today
Today
Today
Today
Today
Today
Today

Photos: Studio Wirz unless stated otherwise

© 2026 Studio Wirz

Photos: Studio Wirz unless stated otherwise

© 2026 Studio Wirz

Photos: Studio Wirz unless stated otherwise

© 2026 Studio Wirz